APS was subcontracted by Sturgeon Electric to install multiple 480VDC flooded battery strings on Buckley Air Force Base (BAFB), in Aurora, CO. Overall, this was a $141M project requiring the construction of approximately 200,000 Square Foot Operations Controlled Access Facility. This was a high profile project ran by the United States Army Corps of Engineers… Read more »
Posts Categorized: Recent Projects
FAA – GNAS Battery Replacement
Contract Number: DTFAAC-11-D-00003 – Base year with 4 option years – Awarded in 2011 APS competitively bids supply and replacement of battery strings at FAA’s General National Air Space (GNAS) facilities located in the Continental United States, Alaska, Hawaii, Puerto Rico, and Guam against two other contractors: Maetec Power – Fairport, NY; and First Logistex… Read more »
Battery Testing at Fort Peck Power Plant, Fort Peck, MT
Contract Number: W9128F-16-M-005 On 21 September 2016 APS was awarded the Station Service Battery Capacity Testing project at Fort Peck, MT by the United States Army Corps of Engineers (USACE). In October APS personnel traveled to Fort Peck to perform testing on (3) 125VDC station battery strings. All strings tested were manufactured by C&D Technologies:… Read more »