This project involved APS removing one string of 24VDC VRLA batteries and installing (2) new 24VDC VRLA batteries onto a two-story recreation center located on the campus at Colorado State University. Due to piping on the roof and existing 10-ton air handlers, this was a logistical challenge, to say the least. Additionally, this project was… Read more »
Posts Categorized: APS Project List
Verizon Wireless Data Center, Colorado Springs, CO
Project Name: Verizon Wireless Data Center – CSP Network Equipment Center Expansion Location: Colorado Springs, CO Primary Contractor: GKK Works Project Description: Applied Power Services was selected to install (16) 480VDC, flooded battery strings at Verizon’s Network Equipment Center (NEC).
Buckley AFB – Aurora, CO
Project Name: Buckley Remote Terminal Fac. Recap. Design for the Mechanical and Electrical Systems in Building 1201 Location: Buckley AFB – Aurora, CO Project Description: Applied Power Services was hired in January 2014 as a subcontractor for the UPS battery removal, and the installation of (3), 480VDC, flooded battery strings. Project highlights included: Battery Removal… Read more »