This project involved APS removing one string of 24VDC VRLA batteries and installing (2) new 24VDC VRLA batteries onto a two-story recreation center located on the campus at Colorado State University.
Due to piping on the roof and existing 10-ton air handlers, this was a logistical challenge, to say the least. Additionally, this project was completed in January, so snow and ice created a safety hazard.
APS subcontracted a 23-ton crane with 100’ boom and performed the job over two days.