Century Electric / Level 3 PR6 Data Room Buildout

Posted by & filed under Uncategorized.

APS was involved with this fast track, large (over 50,000 sq. ft), data room buildout from the ground up. A unistrut grid was built underneath the raised floor in order to support the massive amount of equipment (relay rack, batteries, cable, ladder rack, and aux bar) that was installed above. Each rack was supported with… Read more »